Zoom
Repair work underway on a section of the coastal path in this Costa del Sol town. SUR Infrastructure Are Mijas beaches open for Easter 2026? Repair updates for coastal path and sand replenishmentTown hall to replenish 14,000 cubic metres of sand at El Bombo, Calahonda, and Las Doradas ahead of Easte and repair the damaged section of the coastal path at El Capricho
Mijas
Wednesday, 18 March 2026, 12:43
Mijas town hall is undertaking two projects to repair the damage caused by recent storms along its coastline.
These include restoring the beaches of El Bombo, Calahonda (El Capricho/Alhamar) and Las Doradas and repairs to a damaged section of the coastal path that runs alongside all of Malaga province's coastline.
Heavy machinery is already on site on the beaches to move and deposit up to 14,000 cubic metres of sand, ensuring that this part of the Costa del Sol coast is in perfect condition before Easter.
Related story